Redmond High School

2003

Redmond HS won the CEFPI 2005 Polished Apple Award and the Eagle Award (highest honor) from the ABC of Western Washington.  PCS provided structural consulting again in 2012 for multiple additions to the HS, which increased its size to over 240,000sf.  PCS introduced multiple secondary structural systems to achieve an architectural concept of horizontal, thin bands of glazing and veneer around the building’s exterior.  The end result is a clean structural and architectural system that created the opportunity for exceptional day lighting throughout the campus.