Emerald Queen Casino Parking Garages

2008

The EQC parking garages consist of two new 1,000-stall garages, each consisting of five levels of parking and iconic CMU and glass elevator towers and vestibules.  The design schedule was condensed and the permit drawings were ready in 5 weeks of notice to proceed.  The construction schedule was also fast track and PCS worked hand in hand with the contractor to accomplish a 6-month construction schedule for each garage with parking opening on the lower levels as the upper levels were being constructed.  The garage incorporated an exterior moment frame system allowing for an open, wall free, garage for added security and visibility.